![](https://pirengineering.com/wp-content/uploads/2022/07/image-77.png)
Thai Otsuka (2008)
Kratumban,Samutsakorn
New I.V. Factory 7,500 m2, Cleanroom: 1,500 m2 of Class C General Electrical, BAS, Fire Protection, HVAC, Clean Dry Air, Steam, Purify Water
![](http://pirengineering.com/wp-content/uploads/2022/07/unnamed-1-1.png)
ZuelligPharma-pic01
![ZuelligPharma-pic01](http://pirengineering.com/wp-content/uploads/2022/07/unnamed-1-1.png)
Project Recommend
![Siam Toyota2 (2013) Siam Toyota2 (2013)](http://shop.pirengineering.com/wp-content/uploads/2022/07/mnbmgh.png)
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Siam Toyota (2011) Siam Toyota (2011)](http://shop.pirengineering.com/wp-content/uploads/2022/07/ncnbgdf.png)
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Ekarat (2008-2009) Ekarat (2008-2009)](http://shop.pirengineering.com/wp-content/uploads/2022/07/dsadc.png)
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
![Triumph Aviation (2005) Triumph Aviation (2005)](http://shop.pirengineering.com/wp-content/uploads/2022/07/bfdfd.png)
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}
{"animation_fancy":"","transition_fancy":"","fancy_box_loop":""}