Siam Bheasach (2022)
Bangkok
Renovate and construct Pharmaceutical production line
(Grade, A, B, C, D)
Work scope
- BAS and HVAC automatic control
- HVAC
- WFI, PW, CDA
- Electrical
- Cleanroom Wall, Floor, Ceiling
- Process machine move in and hook up
- Validation document (DQ, IQ, OQ, PQ).
The Mysterious Case of Car Design
Project Recommend
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}