![](https://pirengineering.com/wp-content/uploads/2022/07/image34.png)
Global Power Synergy Public Co., Ltd (2022)
Maptaput, Rayong
Construct new R&D and Pilot plant for GPSC Battery Factory
Work scope
- Dry room (Very low humidity room, Dew point -40C)
- Air condition
- Electrical, Fire alarm, Access control, CCTV, LAN
- Cleanroom Wall & Ceiling
- Sanitary, Plumbing, Drainage system
- Fire protection
![](http://pirengineering.com/wp-content/uploads/slider/cache/6a6f6bb9b0d91e7ba7387ee26998cc71/image59.jpg)
![](http://pirengineering.com/wp-content/uploads/slider/cache/c1d5b88106747f6002f7c438dd900fe2/412445.jpg)
![](http://pirengineering.com/wp-content/uploads/slider/cache/c10f390a0f58ce2af33eb83a21dc1324/1667872908003-scaled.jpg)
![](http://pirengineering.com/wp-content/uploads/slider/cache/5107a33f02ed95f1f46e4499a578fde8/IMG_20220928_190820_2-scaled.jpg)
![](http://pirengineering.com/wp-content/uploads/slider/cache/57dcbda4a1810e3bad1651c983c695ee/LINE_ALBUM_9965-dry-room-_-α╕½α╣eα╕¡α╕cα╣Cα╕aα╕uα╕╖α╣eα╕¡α╕c_α╣AEα╣oα╣Eα╣aeα╣AEα╣o_7.jpg)
![](http://pirengineering.com/wp-content/uploads/slider/cache/8993bd845c686f1cedf9afce629bccbe/412444.jpg)
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
The Mysterious Case of Car Design
![The Mysterious Case of Car Design](https://pirengineering.com/wp-content/uploads/slider/cache/83867201bc2d97596f4d3a76e72c5ce6/image59.jpg)
![The Mysterious Case of Car Design](https://pirengineering.com/wp-content/uploads/slider/cache/5ff82ddd04e57e1eafb03eb2014af841/412445.jpg)
![The Mysterious Case of Car Design](https://pirengineering.com/wp-content/uploads/slider/cache/675b14ba03961734b8215a3e37b2b993/1667872908003-scaled.jpg)
![The Mysterious Case of Car Design](https://pirengineering.com/wp-content/uploads/slider/cache/465660c737a720e1fe983b16d73e6aaa/IMG_20220928_190820_2-scaled.jpg)
![The Mysterious Case of Car Design](https://pirengineering.com/wp-content/uploads/slider/cache/f50b52e3560af45be08abef6b058d13f/LINE_ALBUM_9965-dry-room-_-α╕½α╣eα╕¡α╕cα╣Cα╕aα╕uα╕╖α╣eα╕¡α╕c_α╣AEα╣oα╣Eα╣aeα╣AEα╣o_7.jpg)
![The Mysterious Case of Car Design](https://pirengineering.com/wp-content/uploads/slider/cache/683f93308b85612f65c8d2249f44ca74/412444.jpg)
Project Recommend
![Siam Toyota2 (2013) Siam Toyota2 (2013)](http://shop.pirengineering.com/wp-content/uploads/2022/07/mnbmgh.png)
Siam Toyota2 (2013)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Siam Toyota (2011) Siam Toyota (2011)](http://shop.pirengineering.com/wp-content/uploads/2022/07/ncnbgdf.png)
Siam Toyota (2011)
Supply & Install Facility for Engine Test Bed Room. Air condition, Exhaust, CDA, Cooling tower
![Ekarat (2008-2009) Ekarat (2008-2009)](http://shop.pirengineering.com/wp-content/uploads/2022/07/dsadc.png)
Ekarat (2008-2009)
New Production, PV Solar cell assembly. Machine installation, CDA, RO water, Electrical, Air condition.
![Triumph Aviation (2005) Triumph Aviation (2005)](http://shop.pirengineering.com/wp-content/uploads/2022/07/bfdfd.png)
Triumph Aviation (2005)
New Factory, Air plane engine repair, 5,500 sq.m. Complete design & Construction for New production facility for, Air condition, Mechanical, Electrical
{"arrow":"true","pagination":"true","speed":"2000","autoplay":"true","autoplay_speed":"3000","loop":"true","owl_slide_to_show":"3","slide_show_ipad_owl":"2","slide_show_tablet_owl":"1","slide_show_mobile_owl":"1","owl_slide_to_scroll":"1","owl_slide_margin":"20","owl_slide_padding":"0","owl_start_slide":"0","owl_slide_center":"false","owl_slide_autowidth":"true","owl_slide_freeDrag":"false","owl_height_auto":"false","caption":false,"owl_slide_rtl":"false"}
{"animation_fancy":"","transition_fancy":"","fancy_box_loop":""}